A proposed LNG project north of Prince George is open to public feedback.
JX LNG Canada is proposing a new facility within the Summit Lake area with the 30-day commenting period taking place between now and May 2nd.
The Project will be constructed in two identical phases.
Phase 1 will produce up to 1.35 million tonnes per annum (MTPA) and Phase 2 will produce an additional 1.35 tonnes.
Commercial operations for Phase 1 are expected to commence in 2028.
The Project is expected to operate for 30 years.
An in-person open house is slated for Wednesday, April 10th at the Sandman Signature Great Room at 2990 Recreation Place.
In addition, a virtual session will occur on April 18th from Noon to 2pm.
For those wishing to access paper copies of documents to review, you can head to the Prince George Public Library’s Bob Harkins or Nechako branches.
Something going on in the Prince George area you think people should know about?
Send us a news tip by emailing pgnews@vistaradio.ca.