Some temporary changes are coming to how students and staff at CNC’s PG campus will be able to enter the facility.
Starting on Monday (August 14th), the college will improve the exterior main entrance through a renewal and reconstruction project.
Access to the main campus can be accomplished via the west entrance located between the dental building and the gym.
The 1.1-million-dollar project is slated to wrap up in the fall.
It will include the following:
Something going on in the Prince George area you think people should know about?
Send us a news tip by emailing [email protected].
- Replacement of the concrete and brick in front of the main entrance to address the
water ponding issue for the long term;
• Removal of the large concrete arches outside the main entrance;
• Installation of new flower beds and vegetation between the entrance and
amphitheater; and
• Widening of the sidewalk alongside the short-term parking spots